{"id":11468,"date":"2024-05-08T10:05:50","date_gmt":"2024-05-08T06:05:50","guid":{"rendered":"https:\/\/gbc1.net\/?p=11468"},"modified":"2025-02-09T07:24:24","modified_gmt":"2025-02-09T03:24:24","slug":"feasibility-study-completed-on-cameroon-chad-railway-project","status":"publish","type":"post","link":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/","title":{"rendered":"Feasibility Study Completed on Cameroon-Chad Railway Project"},"content":{"rendered":"\n<p>Following the Restitution Seminar by the Cameroon-Chad Railway Commission conducted at the end of April 2024, the Feasibility Study on the regional Cameroon-Chad Railway Project has been completed. The study was financed by a loan from the <a href=\"https:\/\/gbc1.net\/index.php\/tag\/afdb\/\">#AfDB<\/a> to the tune of FCFA 1.2 billion and the tripartite agreement between AfDB-Cameroon-Chad was signed back in February 2021.<\/p>\n\n\n\n<p>The study identified, analyzed and compared three possible routes with varying costs. Key findings the report have been made available to the public in April 2024, but no final decision has been made as to the best route.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img data-dominant-color=\"8e8c81\" data-has-transparency=\"false\" style=\"--dominant-color: #8e8c81;\" decoding=\"async\" loading=\"lazy\" width=\"600\" height=\"400\" src=\"https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-01w-jpg.webp\" alt=\"Cameroon-Chad Railway Commission Presents Key Findings of Feasibility Study\" class=\"not-transparent wp-image-11482\" srcset=\"https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-01w-jpg.webp 600w, https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-01w-300x200.webp 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption class=\"wp-element-caption\">Cameroon-Chad Railway Commission Presents Key Findings of Feasibility Study<\/figcaption><\/figure><\/div>\n\n\n<p>The first route would start from Ngaound\u00e9r\u00e9, the regional capital of Adamaoua, and reach the Chadian capital, N\u2019Djamena, passing through Garoua, Maroua, and Kousseri in Cameroon. This cost of this route is estimated at FCFA 4,829 billion.<\/p>\n\n\n\n<p>The second route would also start from Ngaound\u00e9r\u00e9 to N\u2019Djamena, this time passing through the Chadian cities of Moundou, K\u00e9lo, and Bongor and would incur an estimated cost of FCFA 2,988 billion. <\/p>\n\n\n\n<p>As for the third route, it would link Ngaound\u00e9r\u00e9 to N\u2019Djamena via Garoua, Figuil, K\u00e9r\u00e9, Pala, K\u00e9lo, and Bongor; it would require an investment of FCFA 4,948 billion.<\/p>\n\n\n\n<p>Earlier, another two routes were also considered: a 400-km route from Ngaound\u00e9r\u00e9 too Moundou, costing FCFA 1,160 billion, and a 1,400-km route passing through Garoua and Maroua too reach N&#8217;Djamena, costing FCFA 1,400 billion.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img data-dominant-color=\"a6b4bc\" data-has-transparency=\"false\" style=\"--dominant-color: #a6b4bc;\" decoding=\"async\" loading=\"lazy\" width=\"360\" height=\"500\" src=\"https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-02-500x360-1-jpg.webp\" alt=\"\" class=\"not-transparent wp-image-11485\" srcset=\"https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-02-500x360-1-jpg.webp 360w, https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-02-500x360-1-216x300.webp 216w\" sizes=\"(max-width: 360px) 100vw, 360px\" \/><\/figure><\/div>\n\n\n<p>Camrail, owned by Bollore Africa Logistics and a subsidiary of Bollore Group, is the concession holder. If all goes well and financing is secured, then the project kick-off is expected in 2026.<\/p>\n\n\n\n<p>The regional rail will facilitate the transport of goods from the Cameroonian port of Douala to the capital of Chad, N&#8217;DJamena. In addition to Chad, the port of Douala provides sea access to landlocked Central African Republic. It will also transport passengers and will improve <a href=\"https:\/\/gbc1.net\/index.php\/tag\/connectivity\/\">#connectivity<\/a> in the northern part of Cameroon.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following the Restitution Seminar by the Cameroon-Chad Railway Commission conducted at the end of April 2024, the Feasibility Study on<\/p>\n","protected":false},"author":1,"featured_media":11481,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false,"_EventAllDay":false,"_EventTimezone":"","_EventStartDate":"","_EventEndDate":"","_EventStartDateUTC":"","_EventEndDateUTC":"","_EventShowMap":false,"_EventShowMapLink":false,"_EventURL":"","_EventCost":"","_EventCostDescription":"","_EventCurrencySymbol":"","_EventCurrencyCode":"","_EventCurrencyPosition":"","_EventDateTimeSeparator":"","_EventTimeRangeSeparator":"","_EventOrganizerID":[],"_EventVenueID":0,"_OrganizerEmail":"","_OrganizerPhone":"","_OrganizerWebsite":"","_VenueAddress":"","_VenueCity":"","_VenueCountry":"","_VenueProvince":"","_VenueZip":"","_VenuePhone":"","_VenueURL":"","_VenueStateProvince":"","_VenueLat":"","_VenueLng":""},"categories":[8],"tags":[86,20],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.12 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Feasibility Study Completed on Cameroon-Chad Railway Project<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Feasibility Study Completed on Cameroon-Chad Railway Project\" \/>\n<meta property=\"og:description\" content=\"Following the Restitution Seminar by the Cameroon-Chad Railway Commission conducted at the end of April 2024, the Feasibility Study on\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/\" \/>\n<meta property=\"og:site_name\" content=\"Global Business Council (GBC)\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-08T06:05:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-09T03:24:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-00w-jpg.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"gbc\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"gbc\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/\"},\"author\":{\"name\":\"gbc\",\"@id\":\"https:\/\/gbc1.net\/#\/schema\/person\/cab6d6e84e5294af65e6aa76c5752fad\"},\"headline\":\"Feasibility Study Completed on Cameroon-Chad Railway Project\",\"datePublished\":\"2024-05-08T06:05:50+00:00\",\"dateModified\":\"2025-02-09T03:24:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/\"},\"wordCount\":326,\"publisher\":{\"@id\":\"https:\/\/gbc1.net\/#organization\"},\"keywords\":[\"AfDB\",\"Connectivity\"],\"articleSection\":[\"Infrastructure\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/\",\"url\":\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/\",\"name\":\"Feasibility Study Completed on Cameroon-Chad Railway Project\",\"isPartOf\":{\"@id\":\"https:\/\/gbc1.net\/#website\"},\"datePublished\":\"2024-05-08T06:05:50+00:00\",\"dateModified\":\"2025-02-09T03:24:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/gbc1.net\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Feasibility Study Completed on Cameroon-Chad Railway Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gbc1.net\/#website\",\"url\":\"https:\/\/gbc1.net\/\",\"name\":\"Global Business Council (GBC)\",\"description\":\"Connecting ... Dots\",\"publisher\":{\"@id\":\"https:\/\/gbc1.net\/#organization\"},\"alternateName\":\"GBC\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gbc1.net\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/gbc1.net\/#organization\",\"name\":\"Global Business Council (GBC)\",\"alternateName\":\"GBC\",\"url\":\"https:\/\/gbc1.net\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gbc1.net\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/gbc1.net\/wp-content\/uploads\/2023\/07\/GBC.png\",\"contentUrl\":\"https:\/\/gbc1.net\/wp-content\/uploads\/2023\/07\/GBC.png\",\"width\":1200,\"height\":200,\"caption\":\"Global Business Council (GBC)\"},\"image\":{\"@id\":\"https:\/\/gbc1.net\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/globiznet\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/gbc1.net\/#\/schema\/person\/cab6d6e84e5294af65e6aa76c5752fad\",\"name\":\"gbc\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/gbc1.net\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d885239a5c83809eb00f912fef7d8048?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d885239a5c83809eb00f912fef7d8048?s=96&d=mm&r=g\",\"caption\":\"gbc\"},\"sameAs\":[\"https:\/\/gbc1.net\"],\"url\":\"https:\/\/gbc1.net\/index.php\/author\/gbc\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Feasibility Study Completed on Cameroon-Chad Railway Project","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/","og_locale":"en_US","og_type":"article","og_title":"Feasibility Study Completed on Cameroon-Chad Railway Project","og_description":"Following the Restitution Seminar by the Cameroon-Chad Railway Commission conducted at the end of April 2024, the Feasibility Study on","og_url":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/","og_site_name":"Global Business Council (GBC)","article_published_time":"2024-05-08T06:05:50+00:00","article_modified_time":"2025-02-09T03:24:24+00:00","og_image":[{"width":600,"height":400,"url":"https:\/\/gbc1.net\/wp-content\/uploads\/2024\/05\/Cam-Chad-Rail-00w-jpg.webp","type":"image\/jpeg"}],"author":"gbc","twitter_card":"summary_large_image","twitter_misc":{"Written by":"gbc","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/#article","isPartOf":{"@id":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/"},"author":{"name":"gbc","@id":"https:\/\/gbc1.net\/#\/schema\/person\/cab6d6e84e5294af65e6aa76c5752fad"},"headline":"Feasibility Study Completed on Cameroon-Chad Railway Project","datePublished":"2024-05-08T06:05:50+00:00","dateModified":"2025-02-09T03:24:24+00:00","mainEntityOfPage":{"@id":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/"},"wordCount":326,"publisher":{"@id":"https:\/\/gbc1.net\/#organization"},"keywords":["AfDB","Connectivity"],"articleSection":["Infrastructure"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/","url":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/","name":"Feasibility Study Completed on Cameroon-Chad Railway Project","isPartOf":{"@id":"https:\/\/gbc1.net\/#website"},"datePublished":"2024-05-08T06:05:50+00:00","dateModified":"2025-02-09T03:24:24+00:00","breadcrumb":{"@id":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/gbc1.net\/index.php\/2024\/05\/08\/feasibility-study-completed-on-cameroon-chad-railway-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gbc1.net\/"},{"@type":"ListItem","position":2,"name":"Feasibility Study Completed on Cameroon-Chad Railway Project"}]},{"@type":"WebSite","@id":"https:\/\/gbc1.net\/#website","url":"https:\/\/gbc1.net\/","name":"Global Business Council (GBC)","description":"Connecting ... Dots","publisher":{"@id":"https:\/\/gbc1.net\/#organization"},"alternateName":"GBC","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gbc1.net\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/gbc1.net\/#organization","name":"Global Business Council (GBC)","alternateName":"GBC","url":"https:\/\/gbc1.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gbc1.net\/#\/schema\/logo\/image\/","url":"https:\/\/gbc1.net\/wp-content\/uploads\/2023\/07\/GBC.png","contentUrl":"https:\/\/gbc1.net\/wp-content\/uploads\/2023\/07\/GBC.png","width":1200,"height":200,"caption":"Global Business Council (GBC)"},"image":{"@id":"https:\/\/gbc1.net\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/globiznet\/"]},{"@type":"Person","@id":"https:\/\/gbc1.net\/#\/schema\/person\/cab6d6e84e5294af65e6aa76c5752fad","name":"gbc","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/gbc1.net\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d885239a5c83809eb00f912fef7d8048?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d885239a5c83809eb00f912fef7d8048?s=96&d=mm&r=g","caption":"gbc"},"sameAs":["https:\/\/gbc1.net"],"url":"https:\/\/gbc1.net\/index.php\/author\/gbc\/"}]}},"_links":{"self":[{"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/posts\/11468"}],"collection":[{"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/comments?post=11468"}],"version-history":[{"count":15,"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/posts\/11468\/revisions"}],"predecessor-version":[{"id":11495,"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/posts\/11468\/revisions\/11495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/media\/11481"}],"wp:attachment":[{"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/media?parent=11468"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/categories?post=11468"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gbc1.net\/index.php\/wp-json\/wp\/v2\/tags?post=11468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}